Main Street Project Updates September 6, 2024
Home » Project Updates » Update September 6, 2024
Construction Update
Sewer work along Church Street into the intersection of Church and Main will continue.
Temporary waterline work within the St. Paul and Main Street intersection is scheduled for completion next week. Once that work has been completed, temporary waterline work will begin at the Pine and Main Street intersection.
Please see the parking and traffic sections below for more information on impacts.
See below in the Nearby Project section for information about upcoming work in the intersection of College and Church.
Traffic Update
The Main and St. Paul intersection will remain closed until Tuesday, 9/10. Once this intersection has reopened, the Pine and Main Street intersection will be closed for a limited duration.
The Main and Church intersection is closed.
Church Street from King to Main Street remains closed.
Work to ensure fire access along Main Street between Church St. and South Winooski will consist of removing parking meters, bike racks, lights, and other furnishings from the north side of the road. An eight foot widening of the sidewalk will allow for a fire lane, and limited/flagger controlled delivery lane for businesses. Preparations for this lane are anticipated to start next week.
Pedestrian traffic will be maintained around work zones. Follow designated pedestrian signage.
See the map below for construction work locations and detours.
For more information on current construction work locations,
detour, and pedestrian impacts for multiple DPW large construction project impacts within the City, click on the map image below.
Parking Update
Additional public parking is available at the Courthouse Plaza garage
Parking at the Courthouse Plaza Garage (South Winooski Ave. entrance only) continues to be available at the City rate of $1.50/hour and space is still highly available.
City rates are only available on the level that is accessed from the South Winooski Ave. entrance.
Public parking on the surface level (access from Church Street) is available nights/weekends and is managed by Unified Parking Partners and follows
their rate structure.
Some public parking has been restored on the lot located at the corner of
Main St. and S. Winooski Ave.
Parking directly in and adjacent to work zones will be impacted.
There will be no parking on the Flynn (south) side of Main St. between St. Paul Street and Church St.
Please follow signage for access to local businesses and alternate business parking.
Explore the City of Burlington’s interactive parking map.
Nearby Project Alerts
Church Street brick work at the intersection of Church and College Street is anticipated to be done Saturday 9/7. While work is still active, there will be no through-traffic between South Winooski and St. Paul Street along College Street (although access to
Center Street will be maintained).
On-street parking will still be available.
Work will then move to the Church and Bank Street intersection. One lane of flagged traffic will be maintained.
The Pride Parade will be happening this week which will involve temporary road closures. More information can be found here:
https://www.pridecentervt.org/event/burlington-pride-festival-and-parade/
For information on nearby projects, click below to go to the
For information on the Champlain Parkway and traffic impacts, click below
Sign up for VT-Alert to receive major alerts about work in Burlington